Planning Application: 204041 (Cork County Council )
File Number:
204041
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
17/01/2020
Decision Due Date:
16/02/2021
Validated Date:
29/01/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
16/02/2021
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
26/01/2021
Applicant Details
Applicant name:
Soleire Renewables SPV Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.
Development Address:
Townlands of Ballyroe, Dromin, Ballynadrideen, Ardnageehy, Rathnacally, and Clashganniv in Ballyhea, Charleville, Co. Cork
Architect Name:
Location Key:
BALLYROE
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
16/02/2021
Manager Order:
4267
Decision Type:
Conditional
Number of Conditions:
52
Grant Date:
22/03/2021
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
No
Expiry Date:
Decision Description:
A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.