Planning Application: 215372 (Cork County Council )
File Number:
215372
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
19/05/2021
Decision Due Date:
21/03/2022
Validated Date:
03/06/2021
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
21/03/2022
Leave to Appeal:
Appeal Date:
07/04/2022
Commenced Date:
Submissions By:
28/02/2022
Applicant Details
Applicant name:
Keel Energy Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The proposed development includes the provision of: 1. Up to 3 no. wind turbines with a maximum overall ground to blade tip height of up to 176.5 metres along with the associated foundations and hard-standing areas, serviced/accessed via the existing Carrigarierk Wind Farm infrastructure, permitted under An Bord Pleanála Planning References 04.246353 and 301563-18 ( Cork County Council Planning References 15/730 and 17/431); 2. An operational life of the proposed development aligned with that of the existing Carrigarierk Wind Farm (25 years from 2021); 3. Underground electrical (33kV) and communication cabling connecting the proposed turbines to the existing 110kV substation in the townland of Carrigdangan; 4. Upgrade of existing tracks and provision of new site access roads and hardstand areas; 5. 1 no. borrow pit; 6. A temporary construction compound; 7. Forestry felling; 8. Operational stage site signage; 9. Site drainage; and, 10. All associated site development works and apparatus. The application is accompanied by a Natura Impact Statement and Environmental Impact Assessment Report.
Development Address:
The townlands of Derryleigh, Gortnahoughtee, Cloghar, Gurteen, Gortatanvally, Lackabaun and Carrigdangan, Co. Cork
Architect Name:
Location Key:
DERRYLEIGH (ED CLONDROHID)
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
21/03/2022
Manager Order:
4446
Decision Type:
Conditional
Number of Conditions:
23
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
No
Expiry Date:
Decision Description:
The proposed development includes the provision of: 1. Up to 3 no. wind turbines with a maximum overall ground to blade tip height of up to 176.5 metres along with the associated foundations and hard-standing areas, serviced/accessed via the existing Carrigarierk Wind Farm infrastructure, permitted under An Bord Pleanála Planning References 04.246353 and 301563-18 ( Cork County Council Planning References 15/730 and 17/431); 2. An operational life of the proposed development aligned with that of the existing Carrigarierk Wind Farm (25 years from 2021); 3. Underground electrical (33kV) and communication cabling connecting the proposed turbines to the existing 110kV substation in the townland of Carrigdangan; 4. Upgrade of existing tracks and provision of new site access roads and hardstand areas; 5. 1 no. borrow pit; 6. A temporary construction compound; 7. Forestry felling; 8. Operational stage site signage; 9. Site drainage; and, 10. All associated site development works and apparatus. The application is accompanied by a Natura Impact Statement and Environmental Impact Assessment Report.