Planning Application: 22395 (Cork County Council )
File Number:
22395
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
10/06/2022
Decision Due Date:
08/02/2023
Validated Date:
21/07/2022
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
07/02/2023
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
18/01/2023
Applicant Details
Applicant name:
Peter and Jackie Hunt
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Refurbishment, alteration and extension of an existing dwelling house, the construction, alteration, reconstruction and extension of outbuildings to provide a home office and boat store and shed/garage, the demolition of an extension to the dwelling and of two sheds one of which is an open faced metal former hay barn, the construction of a new site vehicle entrance and driveway, and associated site works and services connections including a new foul treatment package and percolation area to replace an existing septic tank
Development Address:
Rathmore, Baltimore, Co. Cork
Architect Name:
Location Key:
RATHMORE
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
07/02/2023
Manager Order:
57
Decision Type:
Conditional
Number of Conditions:
20
Grant Date:
13/03/2023
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
No
Expiry Date:
Decision Description:
Refurbishment, alteration and extension of an existing dwelling house, the construction, alteration, reconstruction and extension of outbuildings to provide a home office and boat store and shed/garage, the demolition of an extension to the dwelling and of two sheds one of which is an open faced metal former hay barn, the construction of a new site vehicle entrance and driveway, and associated site works and services connections including a new foul treatment package and percolation area to replace an existing septic tank