Planning Application: 23153 (Cork County Council )
File Number:
23153
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
20/03/2023
Decision Due Date:
18/10/2023
Validated Date:
17/04/2023
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
16/10/2023
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
24/04/2023
Applicant Details
Applicant name:
Gubbeen Farm Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Permission for Retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-Farm Biogas Plant consisting of the following works: a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Construction of a new 12m Dia x 4.27m high overground steel slurry tank with an overall capacity of 482m3. (c) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (d) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (e) And all associated site works
Development Address:
Gubbeen , Schull, Co. Cork
Architect Name:
Location Key:
GUBBEEN
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
16/10/2023
Manager Order:
461
Decision Type:
Conditional
Number of Conditions:
13
Grant Date:
20/11/2023
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
No
Expiry Date:
Decision Description:
Permission for Retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-Farm Biogas Plant consisting of the following works: a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Construction of a new 12m Dia x 4.27m high overground steel slurry tank with an overall capacity of 482m3. (c) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (d) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (e) And all associated site works