Planning application details ref: 235246 Cork County Council

100%100% Complete (warning)

Planning Application: 235246 (Cork County Council )
File Number: 235246
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 19/06/2023 Decision Due Date: 12/09/2023
Validated Date: 29/06/2023 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 12/09/2023
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 24/07/2023

Applicant Details

Applicant name: Grid System Services Limted
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: 10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure.
Development Address: Carrigogna, Midleton, Co Cork
Architect Name: Location Key: CARRIGOGNA
Electoral Division: Planner:
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: Waste Licence Required:
Protected Structure: Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: No Comments:

Decision

Decision Date: 12/09/2023 Manager Order: 5364
Decision Type: Conditional Number of Conditions: 14
Grant Date: 19/10/2023 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?: No
Expiry Date:
Decision Description: 10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure.

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: