Planning application details ref: 236099 Cork County Council

100%100% Complete (warning)

Planning Application: 236099 (Cork County Council )
File Number: 236099
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 17/10/2023 Decision Due Date: 02/07/2024
Validated Date: 02/11/2023 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 01/07/2024
Leave to Appeal: Appeal Date: 29/07/2024
Commenced Date: Submissions By: 11/06/2024

Applicant Details

Applicant name: Soleire Renewables SPV Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.
Development Address: Fiddane, Cooliney, Coolcaum, Ballynoran, Ballynadrideen, Ardnageehy, Charleville, Co. Cork
Architect Name: Location Key: FIDDANE
Electoral Division: Planner:
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: Waste Licence Required:
Protected Structure: Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: No Comments:

Decision

Decision Date: 01/07/2024 Manager Order: 4874
Decision Type: Conditional Number of Conditions: 63
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?: No
Expiry Date:
Decision Description: The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.

Appeal Details


Appeal Details
Notification Date: 29/07/2024 BP Reference #: ABP-320298-24
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: CONDITIONAL Decision Date: 22/11/2024
Withdrawn Date: Dismissed Date:
Reason: