Planning Application: 23697 (Cork County Council )
File Number:
23697
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
08/12/2023
Decision Due Date:
12/03/2024
Validated Date:
21/12/2023
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
05/03/2024
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
22/01/2024
Applicant Details
Applicant name:
Alison Heather
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Permission for the following works to existing dwelling house: (i) construction of extension to rear, (ii) removal of chimney from roof, (iii) changes to external fenestration including enlargement of window to south-west elevation, reduction of window to north-west elevation and changes to window design throughout, (iv) widening of external door to south-east elevation and installation of new external door to south-west elevation, (v) decommissioning of existing septic tank system and installation of replacement wastewater treatment system and (vi) all associated site works
Development Address:
Kilcatherine, Eyeries, Beara, Co. Cork
Architect Name:
Location Key:
KILCATHERINE
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
05/03/2024
Manager Order:
93
Decision Type:
Conditional
Number of Conditions:
16
Grant Date:
08/04/2024
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
No
Expiry Date:
Decision Description:
Permission for the following works to existing dwelling house: (i) construction of extension to rear, (ii) removal of chimney from roof, (iii) changes to external fenestration including enlargement of window to south-west elevation, reduction of window to north-west elevation and changes to window design throughout, (iv) widening of external door to south-east elevation and installation of new external door to south-west elevation, (v) decommissioning of existing septic tank system and installation of replacement wastewater treatment system and (vi) all associated site works