|
|||
---|---|---|---|
File Number: | 244026 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 10/01/2024 | Decision Due Date: | 05/03/2024 |
Validated Date: | 23/01/2024 | Invalidated Date: | |
Further Info Requested: | Further Info Received: | ||
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 05/03/2024 |
Leave to Appeal: | Appeal Date: | ||
Commenced Date: | Submissions By: | 13/02/2024 |
Applicant Details |
|||
---|---|---|---|
Applicant name: | Electricity Supply Board (ESB) | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | The proposed development consists of the construction of a hydrogen production facility comprising a hydrogen compound and contractor’s compound with all associated site access and ancillary site development works. The proposed development will demonstrate the full chain hydrogen production via electrolysis, storage, usage on site via fuel cell and transport offsite to other sector hydrogen users. The proposed development is to be used for hydrogen production for an operational period of up to five years. The proposed development comprises : 1) 1 megawatt (MW) electrolyser including a water purification unit (40-foot (ft) container) (2.5m x 12.2m x 5.4m) with a stack height of 7.7m above ground level, 2) A transformer and control unit container (2.8m x 7.5m x 3.3m) housing a 6.6 kilovolt (kV) to 400kV transformer, 3) A storage container (2.8m x 6.4m x 3.3m), 4) A welfare unit (2.8m x 7.5m x 3.3m), 5) A compressor (20ft container) (2.7m x 6.4m x 4.3m), 6) 5 x 2.5kg low pressure (30 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 7) 3 x 19kg high pressure (300 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 8) 2 x 61kg low pressure (30 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 9) 2 x 31kg high pressure (300 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 10) 4 x 400kg (high pressure) mobile refuelling hydrogen storage vehicles, 11) 2 x 250 kilowatt (kW) hydrogen power units (2.7m x 7.3m x 5.4m), 12) Heavy goods vehicles (HGV) loading bays with 4m high walls, 13) A palisade fence enclosing the hydrogen compound (2.6m height). In addition to the above, planning permission is also sought for all ancillary site and development works to facilitate the development including the MCP filling area, internal site access road, 3 no. car parking spaces, 2 no. EV chargers, barrier, lighting and CCTV, drainage infrastructure and pipe racks/cable trays. After up to five years in operation, the decommissioning phase of the proposed development will comprise the removal of the electrolyser, transformer and control unit container, compressor, MCP units, mobile refuelling hydrogen storage vehicles, hydrogen power units, storage container and welfare unit from the site and removal of loading bay walls to level in line with the concrete yard. The contractors compound area will be reinstated to its present condition during decommissioning. It is pr | ||
Development Address: | 0.56 hectares site within ESB Aghada Generating, Station Ballincarroonig, Aghada, Co Cork P25 XE94 | ||
Architect Name: | Location Key: | BALLINCARROONIG | |
Electoral Division: | Planner: | ||
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | Waste Licence Required: | ||
Protected Structure: | Protected Structure #: | ||
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | No | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 05/03/2024 | Manager Order: | 4292 |
Decision Type: | Conditional | Number of Conditions: | 14 |
Grant Date: | 12/04/2024 | Grant Managers Order #: | |
Section 47 Apply?: | Part 5 Apply?: | No | |
Expiry Date: | |||
Decision Description: | The proposed development consists of the construction of a hydrogen production facility comprising a hydrogen compound and contractor’s compound with all associated site access and ancillary site development works. The proposed development will demonstrate the full chain hydrogen production via electrolysis, storage, usage on site via fuel cell and transport offsite to other sector hydrogen users. The proposed development is to be used for hydrogen production for an operational period of up to five years. The proposed development comprises : 1) 1 megawatt (MW) electrolyser including a water purification unit (40-foot (ft) container) (2.5m x 12.2m x 5.4m) with a stack height of 7.7m above ground level, 2) A transformer and control unit container (2.8m x 7.5m x 3.3m) housing a 6.6 kilovolt (kV) to 400kV transformer, 3) A storage container (2.8m x 6.4m x 3.3m), 4) A welfare unit (2.8m x 7.5m x 3.3m), 5) A compressor (20ft container) (2.7m x 6.4m x 4.3m), 6) 5 x 2.5kg low pressure (30 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 7) 3 x 19kg high pressure (300 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 8) 2 x 61kg low pressure (30 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 9) 2 x 31kg high pressure (300 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 10) 4 x 400kg (high pressure) mobile refuelling hydrogen storage vehicles, 11) 2 x 250 kilowatt (kW) hydrogen power units (2.7m x 7.3m x 5.4m), 12) Heavy goods vehicles (HGV) loading bays with 4m high walls, 13) A palisade fence enclosing the hydrogen compound (2.6m height). In addition to the above, planning permission is also sought for all ancillary site and development works to facilitate the development including the MCP filling area, internal site access road, 3 no. car parking spaces, 2 no. EV chargers, barrier, lighting and CCTV, drainage infrastructure and pipe racks/cable trays. After up to five years in operation, the decommissioning phase of the proposed development will comprise the removal of the electrolyser, transformer and control unit container, compressor, MCP units, mobile refuelling hydrogen storage vehicles, hydrogen power units, storage container and welfare unit from the site and removal of loading bay walls to level in line with the concrete yard. The contractors compound area will be reinstated to its present condition during decommissioning. It is pr |
Appeal Details | |||
---|---|---|---|
Notification Date: | BP Reference #: | ||
Appeal Type: | File Forward Date: | ||
Submission Due Date: | Submission Sent Date: | ||
Appeal Decision: | Decision Date: | ||
Withdrawn Date: | Dismissed Date: | ||
Reason: |