Planning application details ref: 245212 Cork County Council

100%100% Complete (warning)

Planning Application: 245212 (Cork County Council )
File Number: 245212
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 28/06/2024 Decision Due Date: 14/01/2025
Validated Date: 08/07/2024 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 14/01/2025
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 01/08/2024

Applicant Details

Applicant name: Ballybeg Solar Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: Permission for a photovoltaic (Solar PV) energy generation scheme with a total area of 3.76ha within the townlands of Ballybeg and Turbeagh in Mitchelstown Co. Cork. The development will consist of the installation of 4,182 no. ground mounted Solar PV arrays, a 20kV substation, the installation of 120m of 20kV underground electrical cabling from the proposed substation to an existing pole and overhead line to connect to the national grid, the upgrade of an existing entrance off the local road to serve as a permanent site entrance for the solar farm and all associated site development works including upgrading 80m of existing tracks and installing 435m of new access track 3m wide and all associated site works. The applicant is seeking a 10-year planning permission and an operational period of 40 years.
Development Address: Ballybeg and Turbeagh, Mitchelstown, Co. Cork
Architect Name: Location Key: BALLYBEG
Electoral Division: Planner:
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: Waste Licence Required:
Protected Structure: Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: No Comments:

Decision

Decision Date: 14/01/2025 Manager Order: 4049
Decision Type: Conditional Number of Conditions: 50
Grant Date: 18/02/2025 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?: No
Expiry Date:
Decision Description: Permission for a photovoltaic (Solar PV) energy generation scheme with a total area of 3.76ha within the townlands of Ballybeg and Turbeagh in Mitchelstown Co. Cork. The development will consist of the installation of 4,182 no. ground mounted Solar PV arrays, a 20kV substation, the installation of 120m of 20kV underground electrical cabling from the proposed substation to an existing pole and overhead line to connect to the national grid, the upgrade of an existing entrance off the local road to serve as a permanent site entrance for the solar farm and all associated site development works including upgrading 80m of existing tracks and installing 435m of new access track 3m wide and all associated site works. The applicant is seeking a 10-year planning permission and an operational period of 40 years.

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: