Construction of a internal first floor over part of production area in factory for use as laboratory and plantroom with staircase and lift access and external wall grilles
Construction of a two storey manufacturing building, a single storey mix room extension (7.8m high) to the Hi-flow building, a thermal oxidiser, stack (14.6m high)and its associated base, cooling tower and plinth (5m high), solvent recovery unit (15m) and plinth, Drum store, an additional 100 no. carpark spaces, an extension to the existing piperack, associated site works and ancillary landscaping, the relocation of the proposed extension to existing tank farm and tank farm electrical room (MCC) previously granted under P.A. ref: S/01/5172 (change of plan), the construction of a two storey maintenance workshop as granted under P.A. ref: S/01/5172, also the retention of a small single storey water services room as an extension to the West of the Hi-flow building
Construction of new first floor mezzanine production area within the existing warehouse and partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid and caustic storage bund and associated works
No Environment Impact Assesments Associated with this Application