Planning application details ref: 057103 Cork County Council

100%100% Complete (warning)

Planning Application: 057103 (Cork County Council )
File Number: 057103
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 30/09/2005 Decision Due Date: 25/01/2006
Validated Date: 30/09/2005 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 25/01/2006
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Concentrate Manufacturing Company of Ireland Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: Construction of single storey self contained warehouse with loading docks for storage of finished concentrate for soft drinks, attached two storey unit with switch room and fork truck maintenance areas on ground floor and offices on first floor, covered link to existing warehouse on adjoining site, security hut, installation of fire water retention pond, removal of existing pond, installation of attenuation tank, entrance and ancillary site works
Development Address: Ballytrasna, Little Island
Architect Name: , Brendan Sheehan Location Key: BALLYTRASNA
Electoral Division: Planner: Rosie O'Donnell
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: No Comments:

Decision

Decision Date: 25/01/2006 Manager Order: 06/366
Decision Type: Conditional Number of Conditions: 0
Grant Date: 02/03/2006 Grant Managers Order #:
Section 47 Apply?: F Part 5 Apply?: No
Expiry Date: 01/03/2011
Decision Description: Construction of single storey self contained warehouse with loading docks for storage of finished concentrate for soft drinks, attached two storey unit with switch room and fork truck maintenance areas on ground floor and offices on first floor, covered link to existing warehouse on adjoining site, security hut, installation of fire water retention pond, removal of existing pond, installation of attenuation tank, entrance and ancillary site works

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: