Planning Application: 068009 (Cork County Council )
File Number:
068009
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
12/06/2006
Decision Due Date:
06/08/2006
Validated Date:
12/06/2006
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
08/08/2006
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Carrigaline United Association Football Club
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Provision of all-weather training pitch, reconfiguration and extension of existing football pitches, relocation of existing gateway and access road to clubhouse, provision of new access road serving lands to south of football club, provision of roundabout, grading and leveling of adjacent bank to suit pitch levels and associated site works
Development Address:
Carrigaline West
Architect Name:
, Arup Consulting Engineers
Location Key:
CARRIGALINE WEST
Electoral Division:
Planner:
Martin Ryan
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
08/08/2006
Manager Order:
06/4158
Decision Type:
Conditional
Number of Conditions:
0
Grant Date:
13/09/2006
Grant Managers Order #:
Section 47
Apply?:
F
Part 5
Apply?:
No
Expiry Date:
12/09/2011
Decision Description:
Provision of all-weather training pitch, reconfiguration and extension of existing football pitches, relocation of existing gateway and access road to clubhouse, provision of new access road serving lands to south of football club, provision of roundabout, grading and leveling of adjacent bank to suit pitch levels and associated site works
66 no. dwellinghouses with garages for 9 no. dwellings, 6 no. apartments, 2 new entrances, ESB sub-station and foul sewerage pumping station and associated site works
Provision of new 3.45ha amenity park incorporating combined riverside cycleway and walkway, landscaping, seating, picnic and viewing areas, 1.1 metre high metal hooped railings edging walkways, 1.8 metre high paladin boundary fencing and signage, new water main to connect to existing Cork County Council watermain, new pumping station enclosed by a 2.4 metre high palisade fence with acecess road and pumped foul sewer line to connect via right of way to existing Cork County Council main at Ballea Road, new road connecting the proposed road permitted as part of improvements to Carrigaline United grounds (ref. 06/8009) and the future western refief road for Carrigaline and associated site works, all on a total site area of 4.45 hectares
Construction of car park and associated site works to include, alterations to existing entrance, construction of storeroom, installation of flood lighting facilities, erection of safety netting and alterations to layout of existing pitches