Planning Application: 20350 (Cork County Council )
File Number:
20350
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
03/07/2020
Decision Due Date:
27/08/2020
Validated Date:
09/07/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
26/08/2020
Leave to Appeal:
Appeal Date:
22/09/2020
Commenced Date:
Submissions By:
06/08/2020
Applicant Details
Applicant name:
Wingleaf Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
A ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning) and will consist of the following i. Up to 7 no. wind turbines with an overall blade tip height of up to 178.5 metres and all associated foundations and hard-standing areas; ii 2 no. borrow pits; iii 1 No. permanent meteorological mast with a maximum height of up to 112 metres; iv. Upgrade of existing and provision of new site access roads; v. Upgrade to existing access junction; vi. A 38kV electricity substation, including 4 no. battery storage containers, 1 no. control building with welfare facilities, associated electrical plant and equipment, security fencing, and waste water holding tank; vii. Forestry Felling; viii. A temporary construction compound; ix. Site Drainage; x. All associated internal underground cabling, including underground grid connection cabling to the existing overhead line; and xi. All associated site development and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement have been prepared in relation to the proposed development and accompanies this planning application
Development Address:
Derreendonee, Curraglass, and Cappaboy Beg, Co. Cork