Construction of timber frame manufacturing factory consisting of single storey manufacturing/dispatch area, single storey store area, two storey office, external lean-to canopies, signage, detached plant room building, site entrance, internal roadways, provision for car parking, waste water treatment plant and associated site works
Site development works to facilitate the future construction of biotechnology manufacturing facility to include temporary construction access with associated widening of road, signalised junction at intersection off N25 and Hedgy Boreen with associated road works, 20kV substation in a compound with switchgear building and 2 no. transformer pads, gas compound/above ground installation with associated conrtol buildings, earthworks to include cut and fill operations to prepare the site for construction of future buildings, attenuation/retention pond, demolition of 2 no. dwellinghouses, internal access roads, provision for 600 no. surface level car parking spaces, gravelled areas for future buildings, retaining wall and lighting standards, underground services and associated manholes, site boundary treatments to include security fencing and landscaping and all associated and ancillary site development works.
Biotechnology Manufacturing Facility consisting of a 6 level Multi-storey car park, a Bulk Manufacturing Building over 3 storeys with 3 no. intermediate mezzanine levels and two storey Bulk warehouse, a 2 storey Utilities building with intermediate mezzanine level, Utilities yard containing 1 storey electrical switch room building, firewater pumphouse and tanks, water towers etc., a 1 storey Generator Building, Waste water treatment plant with 2 storey building with mezzanine level and 1 storey Solids bld., 1 storey Temp. assembly workshop, Piperack, truck parking area, gravelled areas and all associated site works and services plus amendments to previously permitted site development works consisting of increase of up to 400mm to finished ground level of the development area of site, amendment to internal site roads and assoc. services and amendment to layout and shape of Attenuation/Retention pond
No Environment Impact Assesments Associated with this Application