Planning Application: 089891 (Cork County Council )
File Number:
089891
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
28/11/2008
Decision Due Date:
31/01/2009
Validated Date:
28/11/2008
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
28/01/2009
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Eirgrid on behalf of ESB
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Alterations to the existing 220kV Aghada station comprising of the erection of 2 no. interconnecct bays to include cable sealing ends, surge arresters, line/earth disconnects and post insulators, 2 no. line bays to include cables sealing ends, surge arresters, line/earth disconnects, voltage transformers, current transformers, circuit breakers, pantographs, post insulators and associated site works and retention of 2 no. prefabricated container modules for use as control rooms, 6 no. cable sealing ends & all concrete bases for equipment as described above
Alterations to the existing 220kV Aghada station comprising of the erection of 2 no. interconnecct bays to include cable sealing ends, surge arresters, line/earth disconnects and post insulators, 2 no. line bays to include cables sealing ends, surge arresters, line/earth disconnects, voltage transformers, current transformers, circuit breakers, pantographs, post insulators and associated site works and retention of 2 no. prefabricated container modules for use as control rooms, 6 no. cable sealing ends & all concrete bases for equipment as described above
Aghada Generating Station Ballincarroonig Whitegate
A combined cycle gas turbine (CCGT) power plant, with an output of 380 - 450MW, The development will consist of a gas turbine, heat recovery steam generator; one exhaust stack of up to 70m in height, one by-pass stack of up to 50m high, steam turbine, workshops and stores, control and administration building, water treatment plant, cooling water pumphouse, 440m long submerged sea cooling water outfall pipe with elevated platform at the discharge point, electrochlorination plant, auxiliary boiler with 48m high stack, gas compressor, minor ancillary buildings, two oil tanks of up to 20m in height, three water tanks of up to 15m in height, electrical equipment, transformers, gas compound, sewage treatment plant, miscellaneous plant and equipment, site development, landscaping and fencing. The planning application includes 2 different design options
Two storey extension above the existing workshop to be clad as per the existing buildings plus a glazed lobby entrance, connecting the upper floor to the existing control room
Alterations to existing ESB Aghada 220kV Station consisting of single storey extension to control building, bio-cycle wastewater treatment system and associated site works
ESB Aghada 220kV Electrical Transformer Station Aghada, Ballincarronig
Alterations to the existing 220kV Aghada station comprising of the erection of 2 no. prefabricated container modules for use as control rooms, 2 no. interconnect bays to include cable sealing ends, surge arresters, line/earth disconnects and post insulators, 2 no. line bays to include cables sealing ends, surge arresters, line/earth disconnects, voltage transformers, current transformers, circuit breakers, pantographs, post insulators and associated site works
No Environment Impact Assesments Associated with this Application