Planning application details ref: 045913 Cork County Council

100%100% Complete (warning)

Planning Application: 045913 (Cork County Council )
File Number: 045913
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 30/07/2004 Decision Due Date: 23/09/2004
Validated Date: 30/07/2004 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 23/09/2004
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Electricity Supply Board
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: A combined cycle gas turbine (CCGT) power plant, with an output of 380 - 450MW, The development will consist of a gas turbine, heat recovery steam generator; one exhaust stack of up to 70m in height, one by-pass stack of up to 50m high, steam turbine, workshops and stores, control and administration building, water treatment plant, cooling water pumphouse, 440m long submerged sea cooling water outfall pipe with elevated platform at the discharge point, electrochlorination plant, auxiliary boiler with 48m high stack, gas compressor, minor ancillary buildings, two oil tanks of up to 20m in height, three water tanks of up to 15m in height, electrical equipment, transformers, gas compound, sewage treatment plant, miscellaneous plant and equipment, site development, landscaping and fencing. The planning application includes 2 different design options
Development Address: Aghada Generating Station, Ballincarroonig, Whitegate
Architect Name: Location Key: BALLINCARROONIG
Electoral Division: Planner: Aileen Hurley
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: No Comments:

Decision

Decision Date: 23/09/2004 Manager Order: 04/5477
Decision Type: Conditional Number of Conditions: 0
Grant Date: 29/10/2004 Grant Managers Order #:
Section 47 Apply?: F Part 5 Apply?: No
Expiry Date: 28/10/2009
Decision Description: A combined cycle gas turbine (CCGT) power plant, with an output of 380 - 450MW, The development will consist of a gas turbine, heat recovery steam generator; one exhaust stack of up to 70m in height, one by-pass stack of up to 50m high, steam turbine, workshops and stores, control and administration building, water treatment plant, cooling water pumphouse, 440m long submerged sea cooling water outfall pipe with elevated platform at the discharge point, electrochlorination plant, auxiliary boiler with 48m high stack, gas compressor, minor ancillary buildings, two oil tanks of up to 20m in height, three water tanks of up to 15m in height, electrical equipment, transformers, gas compound, sewage treatment plant, miscellaneous plant and equipment, site development, landscaping and fencing. The planning application includes 2 different design options

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: